Woodland Brown Trex Decking – Discussing begin first we should assess the area could it be a turf or concrete base under the decking a turf base will have to be dug off and membrane put under the decking you are able to and will put membrane under any decking project to avoid any weeds penetrating through, where are the damp course levels once we don’t need those times over the damp course ideally those times needs to be two bricks below the damp course. And can there be any drain access points under the decking because these will be needing an exclusive decking drain cover. Always remember the decking boards go horizontal along your home. Always remember decking higher that 1.2m from the walk out will be needing planning permission
Now we have assessed these factors they are going to decide the height of those times as well as any special requirements that have to be incorporated to the decking project. Estimation of materials first measure the area with the decking i.e 4.8m x 4.8m = 23.04sq meters. Then use this equation to calculate the decking boards needed 4800mm / 140mm (deck board width that are 4.8m long) = 35 decking boards. Add a little for cuts and edges that have to be filled in. Then calculate the strain bearing supports (4 x 2 pressure treated CLS) 4800 / 600 = 8 This the volume of horizontal 4 x 2 pieces needed for that internal structure with the decking together with outside with the frame i.e. 4800 x 4 = 19.2m + (8 x 4800) = 58m of 4 x 2. Add some for that cross member struts and positioning pegs (banged and concreted as needed to the ground) about 3 or 4 4.8m lengths should suffice.
Establishing the frame this should be done near or as close for the position with the final deck. Start by cutting the ends with the required wood square this may help with all the construction with the frame always cut the pieces of wood exactly the same length because frame will not be square in the event the wood is of various lengths. Then join the corners with the frame by piloting the holes for that 4 inch screws to become screwed into wood. Once this is achieved you need to receive the frame square, utilizing an engineers square put it in a single corner and move until square. Then screw a batten in the corner to support the corner square try this for many corners. Then measure internally from the horizontal with the frame the place that the load bearers ‘re going divide this measurement by 600mm this will provide you with an equal spacing for that struts. Next screw theses in position it really is simpler to place a duration of wood under the frame while accomplishing this to have the edges to fulfill. Once this is achieved measure the cross member struts around three feet is about right for that spacing of these. They go vertically along those times frame stepping out then in to enable screwing.
Location of those times, get those times into position with all the help of your friend. Then start in the highest corner of those times and bang a piece of cut 4 x 2 (depending about the height of those times cut accordingly) to the ground which has a large sledge hammer. Once done lift those times into position and screw together which has a 4 inch screw. Now work along those times for the next horizontal corner lifts the corner hence the frame is level and do exactly the same. Now work down the front have a slight lean away from the house or make certain whichever way the boards are running tip those times hence the water runs out with the surface. Then work your way across those times ensuring that that any weak point is supported by banging a piece of 4 x 2 to the ground beneath it. Once this is achieved test the strength by walking down the struts to demonstrate any weak point don’t be concerned too much because decking boards will strengthen the decking whenever they are fixed for the frame.
Right now we cut and match the decking boards for the frame. Make sure all the edges with the decking are cut square before cutting for the correct length. This will aid construction and overall Finnish with the decking project. Start which has a full duration of decking ensuring that the conclusion meets the frame or cut the board for the nearest beam and fix the board which has a Paslode nail gun using 50mm nails or pilot and countersink holes and screw the boards screwing is much better long lasting but nailing is faster and much easier. Work along those times spacing which has a 5mm nail banged right into a piece of 4 x 2, this will ensure the gap remains exactly the same. Always remember to stagger the joints with the decking every other board hence the joints blend to the decking. Once you decking boards are fitted then fit any surrounding decking boards for the edges to pay for up any with the frame work and appearance for just about any boards that have splinters and sand these down if you are able to.