2×6 Redwood Deck Boards – Discussing begin first we must look at the area would it be a turf or concrete base under the decking a turf base will should be dug off and membrane put under the decking it is possible to and should put membrane under any decking project to stop any weeds penetrating through, where will be the damp course levels even as we are afraid occasions across the damp course ideally occasions needs to be two bricks below the damp course. And is there any drain access points under the decking because these need a special decking drain cover. Always remember the decking boards go horizontal along your house. Always remember decking higher that 1.2m off the walk-out need planning permission
Now we now have assessed these factors they will decide the height of occasions as well as any special requirements that should be incorporated in the decking project. Estimation of materials first measure the area with the decking i.e 4.8m x 4.8m = 23.04sq meters. Then use this equation to calculate the decking boards needed 4800mm / 140mm (deck board width which are 4.8m long) = 35 decking boards. Add a little for cuts and edges that should be filled in. Then calculate the strain bearing supports (4 x 2 pressure treated CLS) 4800 / 600 = 8 This the volume of horizontal 4 x 2 pieces needed to the internal structure with the decking plus the outside with the frame i.e. 4800 x 4 = 19.2m + (8 x 4800) = 58m of four years old x 2. Add some to the cross member struts and positioning pegs (banged and concreted if required in the ground) about 3 or 4 4.8m lengths should suffice.
Building the frame this should be done near or as close to the position with the final deck. Start by cutting the ends with the required wood square this might help with the construction with the frame always cut the pieces of wood the identical length because frame will not be square if your wood is of different lengths. Then join the corners with the frame by piloting the holes to the 4 inch screws being screwed into wood. Once this is done you should have the frame square, using an engineers square place it a single corner and move until square. Then screw a batten inside corner to hold the corner square do this for many corners. Then measure internally from the horizontal with the frame in which the load bearers are going divide this measurement by 600mm this will likely give you an equal spacing to the struts. Next screw theses set up it is simpler to place a duration of wood under the frame while carrying this out to find the edges to fulfill. Once this is done measure the cross member struts three feet is approximately right to the spacing of those. They go vertically along occasions frame stepping out then directly into allow for screwing.
Positioning of occasions, get occasions into position with the help of your friend. Then start inside highest corner of occasions and bang an item of cut 4 x 2 (depending on the height of occasions cut accordingly) in the ground having a large sledge hammer. Once done lift occasions into position and screw together having a 4 inch screw. Now work along occasions to the next horizontal corner lifts the corner therefore the frame is level and do the identical. Now work along the front possess a slight lean away from the house or make sure whichever way the boards are running tip occasions therefore the water runs out with the surface. Then work your way across occasions making sure that any weak spot is supported by banging a piece of four years old x 2 in the ground beneath it. Once this is done test the strength by walking along the struts showing any weak spot don’t get worried an excessive amount of because decking boards will strengthen the decking whenever they are fixed to the frame.
Today we cut and suit the decking boards to the frame. Make sure all the edges with the decking are cut square before cutting to the correct length. This will aid construction and overall Finnish with the decking project. Start having a full duration of decking making sure the finish meets the frame or cut the board to the nearest beam and fasten the board having a Paslode nail gun using 50mm nails or pilot and countersink holes and screw the boards screwing is way better long term but nailing is faster and easier. Work along occasions spacing having a 5mm nail banged into a piece of four years old x 2, this will likely ensure that this gap remains the identical. Always remember to stagger the joints with the decking some other board therefore the joints blend in the decking. Once you decking boards are fitted then fit any surrounding decking boards to the edges to pay up any with the frame work and check for just about any boards who have splinters and sand these down if it is possible to.