Solar Post Lights For Caravan Decking – Let’s begin first we must appraise the area can it be a turf or concrete base under the decking a turf base will have to be dug off and membrane put under the decking it is possible to and may put membrane under any decking project to avoid any weeds penetrating through, where are the damp course levels even as don’t need the deck above the damp course ideally the deck ought to be two bricks below the damp course. And perhaps there is any drain access points under the decking because these need an exclusive decking drain cover. Always remember the decking boards go horizontal along your home. Always remember decking higher that 1.2m off the walk out need planning permission
Now we’ve got assessed these factors they will decide the height of the deck and then for any special requirements that have to be incorporated in to the decking project. Estimation of materials first appraise the area of the decking i.e 4.8m x 4.8m = 23.04sq meters. Then make use of this equation to calculate the decking boards needed 4800mm / 140mm (deck board width that happen to be 4.8m long) = 35 decking boards. Add a little for cuts and edges that have to be filled in. Then calculate the stress bearing supports (4 x 2 pressure treated CLS) 4800 / 600 = 8 This the amount of horizontal 4 x 2 pieces needed for your internal structure of the decking in addition to the outside of the frame i.e. 4800 x 4 = 19.2m + (8 x 4800) = 58m of 4 x 2. Add some for your cross member struts and positioning pegs (banged and concreted if required in to the ground) about 3 or 4 4.8m lengths should suffice.
Setting up the frame this ought to be done near or as close for the position of the final deck. Start by cutting the ends of the required wood square this might help with the construction of the frame always cut the bits of wood the same length as the frame won’t be square if the wood is of numerous lengths. Then join the corners of the frame by piloting the holes for your 4 inch screws being screwed into wood. Once this can be done you have to receive the frame square, utilizing an engineers square put it a single corner and move until square. Then screw a batten inside corner to support the corner square do that for all those corners. Then measure internally from the horizontal of the frame where the load bearers are inclined divide this measurement by 600mm this may present you with the same spacing for your struts. Next screw theses available it really is better to place a amount of wood under the frame while carrying this out to find the edges to fulfill. Once this can be done appraise the cross member struts around three feet is around right for your spacing of the. They go vertically along the deck frame stepping out then directly into enable screwing.
Location of the deck, get the deck into position with the help of an friend. Then start inside highest corner of the deck and bang a bit of cut 4 x 2 (depending around the height of the deck cut accordingly) in to the ground having a large sledge hammer. Once done lift the deck into position and screw together having a 4 inch screw. Now work along the deck for the next horizontal corner lifts the corner so the frame is level and do the same. Now work over the front have a very slight lean away from the house or be sure whichever way the boards are running tip the deck so the water runs out of the surface. Then work your way across the deck making certain that any some weakness is supported by banging a piece of 4 x 2 in to the ground beneath it. Once this can be done test the strength by walking over the struts to demonstrate any some weakness no problem an excessive amount of as the decking boards will strengthen the decking once they are fixed for the frame.
Today we cut and match the decking boards for the frame. Make sure all the edges of the decking are cut square before cutting for the correct length. This will aid construction and overall Finnish of the decking project. Start having a full amount of decking making certain the finish meets the frame or cut the board for the nearest beam and fix the board having a Paslode nail gun using 50mm nails or pilot and countersink holes and screw the boards screwing is best long term but nailing is faster and simpler. Work along the deck spacing having a 5mm nail banged right into a piece of 4 x 2, this may ensure how the gap remains the same. Always remember to stagger the joints of the decking another board so the joints blend in to the decking. Once you decking boards are fitted then fit any surrounding decking boards for the edges to cover up any of the frame work and check for any boards which may have splinters and sand these down if it is possible to.