Uber Light Deck – Let’s begin first we have to appraise the area could it be a turf or concrete base beneath the decking a turf base will need to be dug off and membrane put beneath the decking you are able to and will put membrane under any decking project to prevent any weeds penetrating through, where are the damp course levels once we don’t need the deck above the damp course ideally the deck ought to be two bricks below the damp course. And can there be any drain access points beneath the decking because these will be needing an exclusive decking drain cover. Always remember the decking boards go horizontal along the home. Always remember decking higher that 1.2m over ground level will be needing planning permission
Now we’ve assessed these factors they will decide the height of the deck and then for any special requirements that need to be incorporated into the decking project. Estimation of materials first appraise the area in the decking i.e 4.8m x 4.8m = 23.04sq meters. Then use this equation to calculate the decking boards needed 4800mm / 140mm (deck board width which are 4.8m long) = 35 decking boards. Add a little for cuts and edges that need to be filled in. Then calculate the burden bearing supports (4 x 2 pressure treated CLS) 4800 / 600 = 8 This the amount of horizontal 4 x 2 pieces needed for your internal structure in the decking plus the outside in the frame i.e. 4800 x 4 = 19.2m + (8 x 4800) = 58m of four x 2. Add some for your cross member struts and positioning pegs (banged and concreted as needed into the ground) about three or four 4.8m lengths should suffice.
Setting up the frame this should be done near or as close on the position in the final deck. Start by cutting the ends in the required wood square this will help with all the construction in the frame always cut the bits of wood the same length because frame will not be square in the event the wood is of various lengths. Then join the corners in the frame by piloting the holes for your 4 inch screws to become screwed into wood. Once this is accomplished you should get the frame square, having an engineers square put it in a single corner and move until square. Then screw a batten in the corner to carry the corner square try this for all corners. Then measure internally from your horizontal in the frame the place that the load bearers ‘re going divide this measurement by 600mm this will likely offer you the same spacing for your struts. Next screw theses in position it is better to place a period of wood beneath the frame while carrying this out to obtain the edges to satisfy. Once this is accomplished appraise the cross member struts about three feet is around right for your spacing of the. They go vertically along the deck frame stepping out then straight into enable screwing.
Positioning of the deck, get the deck into position with all the help of a friend. Then start in the highest corner of the deck and bang some cut 4 x 2 (depending around the height of the deck cut accordingly) into the ground which has a large sledge hammer. Once done lift the deck into position and screw together which has a 4 inch screw. Now work along the deck on the next horizontal corner lifts the corner hence the frame is level and do the same. Now work down the front have a slight lean away from your house or make sure whichever way the boards are running tip the deck hence the water runs out in the surface. Then work your way across the deck making sure that any some weakness is backed up by banging a piece of four x 2 into the ground beneath it. Once this is accomplished test the strength by walking down the struts to show any some weakness don’t worry a lot of because decking boards will strengthen the decking after they are fixed on the frame.
Now we cut and match the decking boards on the frame. Make sure all the edges in the decking are cut square before cutting on the correct length. This will aid construction and overall Finnish in the decking project. Start which has a full period of decking making sure the conclusion meets the frame or cut the board on the nearest beam and connect the board which has a Paslode nail gun using 50mm nails or pilot and countersink holes and screw the boards screwing is better lasting but nailing is faster and much easier. Work along the deck spacing which has a 5mm nail banged in to a piece of four x 2, this will likely ensure the gap remains the same. Always remember to stagger the joints in the decking some other board hence the joints blend into the decking. Once you decking boards are fitted then fit any surrounding decking boards on the edges to pay up any in the frame work and look for almost any boards which have splinters and sand these down if you are able to.