Behr Mahogany Deck Stain – Why don’t we begin first we have to assess the area would it be a turf or concrete base underneath the decking a turf base will have to be dug off and membrane put underneath the decking you’ll be able to and should put membrane under any decking project to stop any weeds penetrating through, where are the damp course levels even as we don’t need the deck over the damp course ideally the deck should be two bricks below the damp course. And will there be any drain access points underneath the decking because they need a particular decking drain cover. Always remember the decking boards go horizontal along the house. Always remember decking higher that 1.2m over walk out need planning permission
Now we now have assessed these factors they’ll decide the height of the deck and then any special requirements that have to be incorporated into the decking project. Estimation of materials first measure the area with the decking i.e 4.8m x 4.8m = 23.04sq meters. Then use this equation to calculate the decking boards needed 4800mm / 140mm (deck board width which can be 4.8m long) = 35 decking boards. Add a little for cuts and edges that have to be filled in. Then calculate the strain bearing supports (4 x 2 pressure treated CLS) 4800 / 600 = 8 This the volume of horizontal 4 x 2 pieces needed for the internal structure with the decking together with outside with the frame i.e. 4800 x 4 = 19.2m + (8 x 4800) = 58m of four years old x 2. Add some for the cross member struts and positioning pegs (banged and concreted as needed into the ground) about 3 or 4 4.8m lengths should suffice.
Setting up the frame this ought to be done near or as close towards the position with the final deck. Start by cutting the ends with the required wood square this will help using the construction with the frame always cut the pieces of wood the same length because frame will never be square if your wood is of lengths. Then join the corners with the frame by piloting the holes for the 4 inch screws to be screwed into wood. Once this is accomplished you’ll want to get the frame square, employing an engineers square place it in a corner and move until square. Then screw a batten in the corner to keep the corner square try this for all those corners. Then measure internally from your horizontal with the frame where the load bearers are getting divide this measurement by 600mm this can provide you with an equal spacing for the struts. Next screw theses in position it really is simpler to place a period of wood underneath the frame while doing this to obtain the edges to satisfy. Once this is accomplished measure the cross member struts around three feet is approximately right for the spacing of the. They go vertically along the deck frame stepping out then directly into accommodate screwing.
Placement of the deck, get the deck into position using the help of a friend. Then start in the highest corner of the deck and bang some cut 4 x 2 (depending about the height of the deck cut accordingly) into the ground with a large sledge hammer. Once done lift the deck into position and screw together with a 4 inch screw. Now work along the deck towards the next horizontal corner lifts the corner hence the frame is level and do the same. Now work over the front have a slight lean away from your house or ensure whichever way the boards are running tip the deck hence the water runs out with the surface. Then work your way across the deck ensuring that that any some weakness is supported by banging a piece of four years old x 2 into the ground beneath it. Once this is accomplished test the strength by walking over the struts showing any some weakness don’t worry an excessive amount of because decking boards will strengthen the decking once they are fixed towards the frame.
Today we cut and suit the decking boards towards the frame. Make sure every one of the edges with the decking are cut square before cutting towards the correct length. This will aid construction and overall Finnish with the decking project. Start with a full period of decking ensuring that the end meets the frame or cut the board towards the nearest beam and fix the board with a Paslode nail gun using 50mm nails or pilot and countersink holes and screw the boards screwing is better long-term but nailing is faster and easier. Work along the deck spacing with a 5mm nail banged in to a piece of four years old x 2, this can ensure how the gap remains the same. Always remember to stagger the joints with the decking another board hence the joints blend into the decking. Once you decking boards are fitted then fit any surrounding decking boards towards the edges to pay for up any with the frame work and check for any boards that have splinters and sand these down if you’ll be able to.