Trailer Wood Decking – Discussing begin first we have to appraise the area can it be a turf or concrete base underneath the decking a turf base will need to be dug off and membrane put underneath the decking you’ll be able to and will put membrane under any decking project to avoid any weeds penetrating through, where would be the damp course levels once we don’t need when across the damp course ideally when must be two bricks below the damp course. And perhaps there is any drain access points underneath the decking as these will need an exclusive decking drain cover. Always remember the decking boards go horizontal along the home. Always remember decking higher that 1.2m off of the walk out will need planning permission
Now we’ve got assessed these factors they’ll decide the height of when and then for any special requirements that need to be incorporated into the decking project. Estimation of materials first measure the area with the decking i.e 4.8m x 4.8m = 23.04sq meters. Then use this equation to calculate the decking boards needed 4800mm / 140mm (deck board width that are 4.8m long) = 35 decking boards. Add a little for cuts and edges that need to be filled in. Then calculate the strain bearing supports (4 x 2 pressure treated CLS) 4800 / 600 = 8 This the volume of horizontal 4 x 2 pieces needed for your internal structure with the decking in addition to the outside with the frame i.e. 4800 x 4 = 19.2m + (8 x 4800) = 58m of four x 2. Add some for your cross member struts and positioning pegs (banged and concreted if needed into the ground) about a few 4.8m lengths should suffice.
Establishing the frame this carried out near or as close towards the position with the final deck. Start by cutting the ends with the required wood square this might help with the construction with the frame always cut the components of wood the same length because frame will not be square if your wood is of lengths. Then join the corners with the frame by piloting the holes for your 4 inch screws to get screwed into wood. Once this can be done you have to obtain the frame square, utilizing an engineers square place it a single corner and move until square. Then screw a batten in the corner to keep the corner square do this for all those corners. Then measure internally from your horizontal with the frame in which the load bearers ‘re going divide this measurement by 600mm this can give you an equal spacing for your struts. Next screw theses available it’s much easier to place a length of wood underneath the frame while doing this to get the edges in order to meet. Once this can be done measure the cross member struts around three feet is around right for your spacing of these. They go vertically along when frame stepping out then in to enable screwing.
Positioning of when, get when into position with the help of a friend. Then start in the highest corner of when and bang a bit of cut 4 x 2 (depending for the height of when cut accordingly) into the ground using a large sledge hammer. Once done lift when into position and screw together using a 4 inch screw. Now work along when towards the next horizontal corner lifts the corner and so the frame is level and do the same. Now work across the front have a very slight lean away from your house or make certain whichever way the boards are running tip when and so the water runs out with the surface. Then work your way across when making certain that any weak spot is sustained by banging a piece of four x 2 into the ground beneath it. Once this can be done test the strength by walking across the struts to exhibit any weak spot no problem excessive because decking boards will strengthen the decking whenever they are fixed towards the frame.
Now we cut and fit the decking boards towards the frame. Make sure each of the edges with the decking are cut square before cutting towards the correct length. This will aid construction and overall Finnish with the decking project. Start using a full length of decking making certain the final meets the frame or cut the board towards the nearest beam and connect the board using a Paslode nail gun using 50mm nails or pilot and countersink holes and screw the boards screwing is way better long term but nailing is faster and much easier. Work along when spacing using a 5mm nail banged in to a piece of four x 2, this can ensure that the gap remains the same. Always remember to stagger the joints with the decking every other board and so the joints blend into the decking. Once you decking boards are fitted then fit any surrounding decking boards towards the edges to pay for up any with the frame work and check for just about any boards which may have splinters and sand these down if you’ll be able to.